翻訳と辞書 |
Upper Gotvand Dam : ウィキペディア英語版 | Upper Gotvand Dam
Upper Gotvand Dam, or simply the Gotvand Dam, is an embankment dam on the Karun River about northeast of Gotvand in Khuzestan Province, Iran. It currently has an installed capacity of 1,000 MW with another 1,000 MW in the works for a second phase. Studies for the Karun River began in the 1960s and specific designs on the Upper Gotvand were presented in 1967, 1975 and 1982. After the design and location were chosen, a further study was carried out in 1997, the same year preliminary construction (roads, bridges, river diversion) began. The river was diverted by April 2003 and excavation began soon thereafter. After completion of the dam, impounding of its reservoir began on 30 July 2011 during a ceremony attended by Iranian President Mahmood Ahmadinejad. The first generator of phase one was commissioned on 5 May 2012, two more by 18 September 2012 and the final in November 2012.〔(【引用サイトリンク】url=http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=146 )〕 Ahmadinejad was again present for the dam's inauguration on 22 April 2013. Phase 2 is estimated to be complete in 2015 and the dam is going to become one of Iran's largest power stations and is already its tallest earth-fill dam.〔(【引用サイトリンク】url=http://en.iwpco.ir/Gotvand/default.aspx )〕〔(【引用サイトリンク】url=http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=119 )〕 Downstream of the Upper Gotvand Dam is the high Lower Gotvand Dam at . Constructed from 1975 to 1977, it serves to divert portions of the river into two canals for the irrigation of of farmland.〔(【引用サイトリンク】url=http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._4007_v3.pdf )〕 == See also ==
* List of power stations in Iran
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Upper Gotvand Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|